Abstract
This field guide insert describes ground survey procedures for measuring soil disturbance after timber harvesting. These procedures are not intended for use following mechanical site preparation (MSP). Separate procedures are being developed for MSP.
Download FGI05 PDF file (705 KB)
To view this document you need the current version of
Adobe Acrobat Reader, available free from the
Adobe Web Site.
Updated October 23, 2008
|