Forest Investment Account (FIA) - Land Base Investment Program
FIA Project 6729001

    Sally Road Deactivation
 
Project lead: Hamilton, Dave (BC Timber Sales)
Author: Williams, Rod
Subject: Forest Investment Account (FIA), British Columbia
Series: Forest Investment Account (FIA) - Land Base Investment Program
Description:
Sally Road was constructed at least 10 years ago using conventional side cast methords. While the construction benching (ie/ 3/4 bench cut) varied, significant volumes of fill material were deposited on moderate to steep gradient slopes. Cutslope composition varied along the section from colluvial and till soils to massive component bedrock.
The fillslope material was predominately composed of subangular rock 0.3km in diameter with mixed larger clasts, soil and organics.
A moderate size fillslope failure was observed during the initial field review which deposited into the unnamed stream below. The likely cause of the failure was over steepened fill placement and drainage concentration/ diversion.
Observations made during the built field review indicate the fillslope was retained by large woody derbis (stumps and decked timber at the tree line). Some of the stumps show sign of vertical displacement.

    Deliverables:

Project Completion Abstract (2.3Mb)

To view PDF documents you need Adobe Acrobat Reader, available free from the Adobe Web Site.

Updated August 16, 2010 

Search for other  FIA reports or other Ministry of Forests and Range publications.

Please direct questions or comments regarding publications to For.Prodres@gov.bc.ca