Standard Bridge Material Templates for Requisitions and
Works Contracts Including Bridge Material Supply
These MFR standard bridge material requisition
templates are intended to be used primarily by MFR
field engineers and/or the professional engineer taking
responsibility for a bridge structure design and/or
installation. Bridge material requisitions must be
consistent with the design. It is recommended that the
regional field engineer be consulted when developing a
bridge material requisition for a specific project.
The language in the requisition templates should also
be incorporated into ministry contracts where bridge
material supply is included in the contracted works.
The design and quality assurance requirements for bridge
material supply under direct requisition or through a
design, supply and construct contract are identical.
Bridge material requisitions should limit the design
requirements to specific structural design. The
required components for a structure should be fully
determined, by the design engineer, by the time that
materials are being acquired. For example, for slab
girder bridges, the general arrangement design should
specify whether the girders are connected, whether the
connections are field grouted or welded shear
connectors, and the design should specify the girder
connection details to the abutments.
Requisitions should be specific to the bridge materials
being ordered and reference the applicable FS Bridge
Design and Construction Manual specifications and
standard drawings. Only in the odd instance where
bridge materials have had a unique design completed
should other drawings be included in the bridge material
specifications. In such cases, the attached drawings
should be limited to the detail necessary for the bridge
material fabricator to implement. Incorporation of
general arrangement drawings, which require
interpretation by the bridge material fabricator, is to
be avoided.
The bridge material templates are living documents and
it is recommended that the latest templates be accessed
and utilized when ordering bridge materials or
developing contracts with bridge material supply
phases.
Any
questions pertaining to the requisitions, contact the
regional field engineer.
Return to
Bridges
and Major Culverts page
|
Descriptor |
Type
|
(KB) |
Date |
Standard Bridge Material Templates
- All Steel Portable
Drawings:
STD-E-090.01
STD-E-090.02
- Concrete Slab Girders- Concrete Deck on Steel Girders
- Timber Deck on Steel Girders
|
Word
pdf
pdf
Word
Word
Word |
106
57
90
1672
140
132 |
July 15, 2008
July 15, 2008
July 15, 2008
July 15, 2008 |
|