| Descriptor |
Type
|
(KB) | Date |
| Bridges/Culverts - Letters/Directives | LINK | ||
| Bridge Design Standards, Manuals & Guideline Documents | |||
| Standard Bridge Material Templates | LINK | ||
| Inspection and Inventory Forms | LINK | ||
|
Interim Bridge Design Guidelines - these are provided for direction and guidance |
PDF |
July 23/10 |
|
| Design of Single-Lane Shear- Connected Slab Bridges, Rev.1 | Oct. 20, 2004 | ||
|
Forest Service Bridge Design and
Construction Manual - standard design drawings - list of revisions to standard design drawings (pending) |
July 30, 1999 | ||
| Engineering Manual Chapter 4, Design and Construction of Bridges and Major Culverts | 656 | June 29, 2009 | |
| Other Guidance Documents and Links | |||
| Protocol for Inspection of Bridge Bearings | 3,139 | Feb. 2011 | |
| Grout Sampling Procedures | July 7, 2010 | ||
| Sample As-Built Bridge Drawings | |||
| Guidelines for Professional Services in the Forest Sector - Crossings | LINK | March 2005 | |
| Procedures for Inspection and Evaluation of Glued-Laminated Bridges, Ministry of Forests | 951 | Nov. 1993 | |
| Report - Log Bridge Stringers and Needle Beam Sizing | 4,055 | Oct. 1981 | |
|
Forest Investment Account, Land Based
Activities, Fish Passage Activity - links to requirements and standards for fish passage remediation projects |
LINK | ||
|
Fish Passage Technical Working Group - links to FIA Fish Passage Activity documentation and other sources for fish passage guidance |
LINK | ||
| Other Documents, Reports & Presentations | |||
| Road Load Rating Project | |||
| Evaluation of truck configurations for "Road Load Rating", Gary McClelland, P.Eng., SNT Engineering | |||
| Report - Road Load Rating Project - Final | July 10, 2012 | ||
| July 10, 2012 Presentation | July 10, 2012 | ||
| Curb Design Parameter Studies | |||
| Guideline for Barrier Selection and Design, Associated Engineering | 616 | Aug. 2011 | |
|
2010/11 Experimental Evaluation of Concrete Decks with Guard Rail Systems - C. Villiard, C. Dickof, M. Angers, J. Schneider, S.F. Stiemer, Department of Civil Engineering, UBC |
Report |
9,581 | May, 2011 |
| 2010/11 Phase II Development of MFR Standard Curb Design Parameters - Barrier Selection and Design Philosophy, Associated Engineering | 1295 | Mar. 2011 | |
|
2010/11
Development of Standard Curb Design
Parameters Literature Review Summary, Associated Engineering |
8067 | Jan. 2011 | |
|
2009/10 Experimental Evaluation of Guard Rail Systems for Bridges - C. Villiard,M. Khorasani, S.F. Stiemer, Department of Civil Engineering, UBC |
Draft
Report |
11,835 | Sept. 10, 2010 |
|
Presentation |
3,647 | July 15, 2010 | |
| Timber Deck Analysis Studies | |||
| Phase 2 - Evaluation of timber deck systems to develop rational engineering design and analysis of existing systems - Ricardo Foschi, PhD. |
Report |
825 | Feb. 15 2011 |
|
Presentation |
269 | Mar.30, 2011 | |
| Evaluation of timber deck systems to develop rational engineering design and analysis of existing systems - Ricardo Foschi, Phd |
Report |
671 | Mar 30, 2010 |
|
Presentation |
516 | July 15, 2010 | |
|
Final report on design
checks for timber decks on steel girders on
forestry roads of British Columbia -
Baidar Bakht, Aftab
Mufti, Gamil Tadros - Nov 19, 2008 |
3776 | Nov. 19, 2008 | |
| Other | |||
| MFLNRO In-Plant Bridge and Cattleguard Inspection Services | 4,896 | Mar. 6, 2012 | |
| Jovo Creek Bridge Collapse - Lessons Learned - Tom Johnson, Brian Chow |
Presentation |
865 | Nov. 2010 |
|
Design and Installation of Embedded
Culverts, Presentation Pilot 2, Kamloops
March 12, 2002 - Greg McKinnon, George
Robison, Brian Chow |
Part 1 PDF Part 2 PDF Part 3 PDF Part 4 PDF |
2,444 4,160 7,008 717 |
March 2002 |