|
|
| You are here: Research Branch > Stand Management > Planting Density > EP 964 Espacement Trials in the BC Interior (EP 964)Introduction
ObjectivesTo determine the effects of espacement (planting density) on the growth, development and yield of interior conifers. TreatmentsFor all single-species trials, three replications of each of five levels of initial planting density (500, 1000, 1500, 2000, 2500 trees per hectare) are being tested. Treatment plots vary in size depending on espacement. At most study sites, treatment plots contain 144 trees (12 rows of 12 trees); plots contain 100 trees (10 rows of 10 trees) at two sites. The Pl/Sx mixed-species trial is a factorial experiment that combines three levels of planting density (1000, 1500, 2000 trees per hectare) with five levels of species' composition (proportions of 0, 25, 50, 75, and 100% of each species). The 15 combinations are replicated twice. All single-species plots contain 144 trees (12 rows of 12 trees), and all mixed-species plots contain 225 trees (15 rows of 15 trees). All of the installations are re-measured at 5-year intervals.
Installation Details (map) |
| Inst | District | Spp | BEC | Year Establ. |
Lats | Longs | Map |
| 2 | Nadina | Pl | BSmc2 | 1988 | 54-3' | 127-23' | 93L.004 |
| 4 | Skeena Stikine | SW | BSmc2 | 1986 | 55-0' | 127-12' | 93L.094 |
| 5 | Skeena Stikine | Pl | BSdk | 1989 | 54-35' | 126-52' | 93L.056 |
| 6 | Nadina | Pl | BSmc2 | 1987 | 54-19' | 126-17' | 93L.039 |
| 7 | Central Cariboo | Pl | BS | 1987 | 52-17' | 121-58' | 93A.021 |
| 8 | Kamloops | Fdi | ICH | 1987 | 51-17' | 119-49' | 82M.021 |
| 9.1 | Rocky Mountain | Pl | MS | 1987 | 49-21' | 115-26' | 82G.033 |
| 9.2 | Rocky Mountain | Py | MS | 1989 | 49-21' | 115-26' | 82G.033 |
| 10 | Okanagan Shuswap | Pl | MSdm1 | 1988 | 49-29' | 119-19' | 82E.044 |
| 11 | Rocky Mountain | Pl | MS | 1988 | 50-14' | 114-58' | 82J.026 |
| 12 | Okanagan Shuswap | Sx | ICHmw2 | 1989 | 50-41' | 119-10' | 82L.065 |
| 13 | Central Cariboo | Sx | ICHmk2 | 1989 | 52-30' | 121-41' | 93A.052 |
| 14 | Vanderhoof | Pl | BS | 1991 | 53-37' | 124-2' | 93F.070 |
| 15 | Vanderhoof | Sx | ESSF | 1991 | 53-40' | 124-4' | 93F.070 |
| 16 | Headwaters | Fdi | ICHmw3 | 1992 | 51-27' | 119-27' | 82M.043 |
| 20 | Okanagan Shuswap | Pl | ESSFxc5 | 1993 | 50-4' | 118-44' | 82L.007 |
| 21 | Rocky Mountain | Lw | ICHmw2 | 1994 | 49-19' | 115-54' | 82G.031 |
| 22 | Okanagan Shuswap | PL, SX | ESSFdc2 | 1994 | 50-20' | 119-38' | 82L.032 |
| 23 | Arrow Boundary | Sx | MSdm1 | 1995 | 49-33' | 118-45' | 82E.057 |
| 24 | Okanagan Shuswap | Fdi | ICHmw2 | 1996 | 50-37' | 119-16' | 82L.064 |
| 25 | Okanagan Shuswap | LW | ICHmw2 | 1997 | 50-30' | 119-0' | 82L.010 |
| 26 | Arrow Boundary | SX | ESSFwc2 | 2000 | 50-4' | 118-20' | 82L.009 |
|
Last Modified: 2007 APR 20. Ministry contact: Frank van
Thienen
|