Subproject Summary
Return to: Project Summary
Subproject:
|
Sunset Prairie Mechanical Site Prep. Trial
|
| Project Number: |
EP1195 |
| District(s): |
Dawson Creek |
| Location: |
Sunset Prairie Research Area |
| Project Leader(s): |
George Harper and Balvinder Biring, B.C. Ministry of Forests,
Research Branch, Victoria |
| Contact: |
|
| Trial Established by: |
L. J. Herring |
Introduction:
During 1995, several vegetation management trials were assessed for remeasurement to
obtain long term conifer response data (>5 years post-treatment). Candidate research
trials were screened based on published and unpublished reports, experimental design,
field surveys and communications with operational and research staff. Of those candidate
trials, the Sunset Prairie project in the Dawson Creek Forest District were chosen for
remeasurement (Figure
1. (115k gif))..
Objectives:
- To document spruce seedling response to site preparation and herbicide treatments (fall
shearing with or without disking, with or without post plant glyphosate treatment) 12
years after the herbicide treatment.
- To compare the diameter, height and crown growth of planted spruce seedlings after site
preparation and herbicide treatments (fall shearing with or without disking, with or
without post plant glyphosate treatment).
- To compare the number of stems per hectare (sph) of conifer and broadleaf species and of
well spaced and free growing spruce seedlings 12 years after site preparation and
herbicide treatments (fall shearing with or without disking, with or without post plant
glyphosate treatment).
Treatments:
| Treatment |
Herbicide application rate |
Equipment used |
| disked + glyphosate |
glyphosate (Roundup®) @ 2.4 kg a.i./ha
(spray volume 300 l/ha) applied August 22, 1983 |
Komatsu D65 crawler towing a heavy
tandem Rome breaking disk, April 21, 1983 and backpack sprayer with hand held boom |
| disked only |
na |
Komatsu D65 crawler towing a heavy tandem Rome breaking
disk, April 21, 1983
|
not disked + glyphosate
|
glyphosate (Roundup®) @ 2.4 kg a.i./ha (spray volume 300
l/ha) applied August 22, 1983 |
backpack sprayer with hand held boom |
| not disked only |
na |
na |
Layout:
- On October 31st and November 1st 1995, planted spruce seedlings and surrounding hardwood
vegetation were sampled within each treatment area
- 30 spruce seedlings were selected for measurement using a systematic random sampling
technique with random start
- 3 - 3.99 m radius plots were randomly established within each treatment area to measure
total stems/ha of conifer and deciduous components, stems/ha of free growing crop trees,
and the height and basal diameter of 5 deciduous stems (overstory)
- Conifer and deciduous stems were assessed for condition and damage using the Expert
Committee on Weeds codes (Appendix)
- Spruce total height and height for every odd year was measured back to the earliest post
treatment year possible which was 1985 in most cases
- The 10 m wide area along the treatment plot boundaries was not sampled to avoid the
influences of boundary edges
Sites:
- Sunset Prairie Research Area
Major Findings:
Figure
2. 1985 - 1995 Spruce Seedling Height (30k gif)
References and Publications (Click on Highlighted References To Obtain an Electronic
Copy in PDF Form):
Comeau, P.G., G.J. Harper and J. O. Boateng. 1993. Conifer response to brushing
treatments, a review of available information. Draft report. B.C. Ministry of Forests,
Victoria, B.C.
To obtain any publications that are not highlighted click here.
To Previous Subproject
Last Updated: May 29, 1998.