This activity requires that both the general standard (FS 1001) and the Ministry Survey Standard be followed as well as a survey-specific standard, the procedures for calculation of the internal rate of return and First Nations Review and Comment procedures at the strategic planning stage.
Required Standards |
Version Date |
Archived Versions |
| General Standard for Ministry Funded Programs (FS 1001) | April
1, 2007 |
|
April 1, 2007 |
||
| Internal Rate of Return | ||
| Process for First Nation Review and Comment | 2007 / 2008 | 2006 Interim |
| FFT Stocking Standards Policy | August 15, 2007 |
|
| Overlaping Data Procedures and Encumbrance Checking | October 1, 2007 |
|
Survey-specific Standards |
|
|
Mouse Click on Map " There are area specific survey standards for both fire and MPB infested areas. Click on the map to the right to bring up the locator map. On the locator map, click on the area of the province where you will be surveying to bring up the survey-specific standards for that TFL / TSA.
|
|
|
Related Standards |
Version Date |
Archived Versions |
July
15, 2006 |
||
June
15, 2006 |
||
January
2005 |
||
| MoF Visual Identifier Standards Guide (formerly Cartographic Manual) | October 1994 |
|
This site is best viewed at 1024x768 pixels. The site is Java Script and Flash enabled.