Draft, Remedial Measures Primer Pilot Version 1.0

Previous Page TOC Next Page

USING THE MODEL STEP-BY-STEP


We will apply the model (Figure 5.9) to the Tunkwa Lake example just as it was presented in Chapter 3.

RM Model

Previous Page Page Top TOC Next Page