What's
new in SPAR - August 2009
Following
are some highlights of maintenance and
enhancement items included in SPAR
releases during 2009.
SPAR - Release 05.04 - Aug. 2009
- Seedlot Collection Area Capture Tool - this new spatial
polygon mark-up tool provides a SPAR user with the ability to mark-up one or
more polygons in SeedMap, representing the geographic area of the cone
collection when registering a natural stand seedlot in SPAR . A
new table - SEEDLOT_COLLECTION_GEOMETRY was createdin SPAR. The collection area spatial data
from this table is copied each night to the Land and Resource Data Warehouse (LRDW).
- Seed Use Summary Reports - submission screen updated to
enable multi-year report submissions. When multiple sowing years are
submitted, the results are reported by year, then as an average. For
the Seed Use by Genetic Source, a chart "Seedling Requests by Sowing Year
and Species" is also created.
- New Seed Use Summary Reports created - Seedlings
Requested by: Species and SPU; by SPU and Orchard; by Orchard and SPU.
Each report also generates a chart.
- New Seed Orchard Summary reports - Orchard Cone Crop
Actuals (production by year, species, orchard, seedlot); Orchard Seed
Production (total production for multiple years by species, orchard); Total
Seed Production Ministry vs. Industry (for multiple years, species and
ministry/industry).
- Lot Search - ability to search for seedlots that have not
completed registration ie. INC, SUB, PND, APP status.
- Various small maintenance items.
SPAR - Release 05.03 - April 2009
-
Amendment to the Chief
Forester's Standards for Seed
Use implemented in SPAR -
increase in upper elevation
transfer limit for seedlots.
- Seedling Request override requirement when a Class B
seedlot is selected when a Class A seedlot is available has been changed to
correspond with the Standards. The prompt for the override will occur
when a seedlot with Genetic Worth of G+05 or greater is available.
- Seedling Requests for vegetative lots - both seedlots and
vegetative lots are now displayed on the Lot Selection screen, regardless of
stocktype selected. The stocktype is updated after the lot selection.
- Seedling Request - "Comment" field renamed "Client
Reference".
- Orchard Report - columns added and revised.
- Various small maintenance items.
SPAR - Release 05.02 - Feb. 2009
- New Report to compare Seedlings Requested from SPAR with
Seedlings Lifted (from NSA for Ministry funded seedlings) and Seedlings Planted (from
RESULTS).
- New Report to compare the stored SPZ and BGC of a Class B
seedlot with the SPZ and BGC information determined spatially for the
seedlot's mean collection latitude and longitude coordinates.
- Seed Use Report submission screens merged and mandatory
parameters changed to allow Sowing Year OR Planting Year to be entered.
- Seedlot Registration - Copy function added to allow Tree
Seed Centre to register returned seed more efficiently.
- Seedlot Registration - Orchard ID field moved to page
one.
- BC Sunrise logo added to all the SPAR reports.
- SPAR menu changed to be dynamic based on user authority
level.
SPAR - Release 05.01 - Oct. 2008
- Integration of the new BGC tables and geometry throughout
SPAR.
- Updates to Seedling Request to incorporate FTA changes
from Timber Mark table to Hauling Authority table.
- Re-design of Tree Seed Centre Contacts table to allow 5
Client Types for each Client Contact.
- Re-design of Orchard table, to store Seed Planning Unit
(SPU) data for each orchard.
- Re-design of SPAR logon security to use either Client
Number or Org Unit, but not both.
- Several minor bug fixes and screen changes.
|
|
|
|